Skip to main content
Jun 28, 2026•Well Monitoring

Taming Amp Swings: ESP Optimization Lessons from Our ALARM Team

Operational efficiency means balancing maximum drawdown with system integrity — practical tubing-pressure, speed-step, and PID tips for stabilizing motor current.

C
Christopher TimberlakeEngineer

The Handiwork of Our ALARM Team

This is the handiwork of our ALARM team! Few things are more satisfying than stabilizing motor current and increasing intake pressure drawdown.

Optimization Is More Than Production

Optimizing ESPs is more than increasing production — operational efficiency is balancing maximum production and drawdown with maintaining system integrity.

High amp swings from gas interference and/or sub-optimal PID/gas lock configuration are detrimental to electrical and mechanical components of an ESP.

What to Consider When Optimizing

  • With gas interference, verify tubing pressure first. Aim for about 200-psi differential above casing pressure, sometimes more in extreme cases. And then determine if PID is needed.
  • When adjusting speed, use 0.5 to 1.0 Hz step changes, allowing the well to stabilize before the next increase.
  • When setting up PID, start with the average current to maintain speed initially. Step size and interval should be gradual to allow appropriate response.
  • Speed clamps should be set correctly to allow sufficient frequency change for steady current while keeping load within VSD rating.
  • Never "set it and forget it." Continuous monitoring is essential until operation is stable.

Take a Look at Your Wells

See how many of your ESPs have current swings of 5–10 amps or more. Are those trends recent, or have they been going on for a while? There may be some opportunities for improvement by applying these couple of tips.